Quarterly report pursuant to Section 13 or 15(d)

Commitments And Contingencies

v3.19.1
Commitments And Contingencies
3 Months Ended
Mar. 31, 2019
Commitments And Contingencies [Line Items]  
Commitments And Contingencies

12.  COMMITMENTS AND CONTINGENCIES



TAX ABATEMENT AGREEMENTS

Pursuant to agreements with certain municipalities, the Company is required to make payments in lieu of property taxes (“PILOT”) on certain of its properties and has tax abatement agreements on other properties, as follows: 



The Harborside Plaza 4-A agreement with the City of Jersey City, as amended, which commenced in 2002, is for a term of 20 years.  The annual PILOT is equal to two percent of Total Project Costs, as defined.  Total Project Costs are $49.5 million.  The PILOT totaled $270,000 and $270,000 for the three months ended March 31, 2019 and 2018, respectively.



The Harborside Plaza 5 agreement, also with the City of Jersey City, as amended, which commenced in 2002, is for a term of 20 years.  The annual PILOT is equal to two percent of Total Project Costs, as defined.  Total Project Costs are $170.9 million.  The PILOT totaled $1.1 million and $1.1 million for the three months ended March 31, 2019 and 2018, respectively.



The Port Imperial South 1/3 Garage development project agreement with the City of Weehawken has a term of five years beginning when the project is substantially complete, which occurred in the fourth quarter of 2015.  The agreement provides that real estate taxes be paid at 100 percent on the land value of the project only over the five-year period and allows for a phase in of real estate taxes on the building improvement value at zero percent in year one and 95 percent in years two through five.



The Port Imperial Hotel development project agreement with the City of Weehawken is for a term of 15 years following substantial completion, which commenced initial operation in December 2018.  The annual PILOT is equal to two percent of Total Project Costs, as defined therein. 



The Port Imperial South 11 development project agreement with the City of Weehawken is for a term of 15 years following substantial completion, which occurred in August 2018.  The annual PILOT is equal to 10 percent of Gross Revenues, as defined therein.



The 111 River Realty agreement with the City of Hoboken, which commenced on October 1, 2001 expires in April 2022.  The PILOT payment equaled $1.2 million annually through April 2017 and then increased to $1.4 million annually until expiration.  The PILOT totaled $352,000 and $352,000 for the three months ended March 31, 2019 and 2018, respectively.



The Monaco Towers agreement with the City of Jersey City, which commenced in 2011, is for a term of 10 years.  The annual PILOT is equal to 10 percent of gross revenues, as defined.  The PILOT totaled $0.4 million and $0.6 million for the three months ended March 31, 2019 and 2018, respectively.



The Marbella II agreement with the City of Jersey City, which commenced in 2016, is for a term of 10 years.  The annual PILOT is equal to 10 percent of gross revenues for years 1-4, 12 percent of gross revenues for years 5-8 and 14 percent of gross revenue for years 9-10, as defined therein.  The PILOT totaled $0.2 million for the period from acquisition (January 31, 2019), through March 31, 2019.



The Port Imperial South Parcel 8/9 development project agreement with the City of Weehawken is for a term of 25 years following substantial completion, which is anticipated to occur in the fourth quarter 2020.  The annual PILOT is equal to 11 percent of gross revenue for years 1-10, 12.5 percent for years 11-18 and 14 percent for years 19-25, as defined therein.



At the conclusion of the above-referenced agreements, it is expected that the properties will be assessed by the municipality and be subject to real estate taxes at the then prevailing rates.



LITIGATION

The Company is a defendant in litigation arising in the normal course of its business activities.  Management does not believe that the ultimate resolution of these matters will have a materially adverse effect upon the Company’s financial condition taken as whole.



GROUND LEASE AGREEMENTS

Future minimum rental payments under the terms of all non-cancelable ground leases under which the Company is the lessee, as of March 31, 2019, are as follows (dollars in thousands):



 

 



 

 

Year

 

Amount

April 1 through December 31, 2019

$

1,297 

2020

 

1,750 

2021

 

1,750 

2022

 

1,750 

2023

 

1,750 

2024 through 2084

 

158,007 



 

 

Total

$

166,304 

 

Ground lease expense incurred by the Company amounted to $629,651 and $550,000 during the three months ended March 31, 2019 and 2018, respectively.



In conjunction with the adoption of ASU 2016-02 (Topic 842), starting on January 1, 2019, the Company capitalized operating leases, which had a balance of $22.5 million at March 31, 2019 for five ground leases.  Such amount represents the net present value (“NPV”) of future payments detailed above.  The incremental borrowing rates used to arrive at the NPV ranged from 5.637 percent to 7.618 percent for the remaining ground lease terms ranging from 6.25 years to 82.58 years.  These rates were arrived at by adjusting the fixed rates of the Company’s mortgage debt with debt having terms approximating the remaining lease term of the Company’s ground leases and calculating notional rates for fully-collateralized loans.



CONSTRUCTION PROJECTS

In 2015, the Company entered into a  90-percent owned joint venture with XS Port Imperial Hotel, LLC to form XS Hotel Urban Renewal Associates LLC, which is developing a 372-key hotel (164 keys Residence Inn and 208 keys Marriott Envue) in Weehawken, New Jersey.  The Company acquired the remaining 10 percent interest in the joint venture on March 26, 2019.  The Residence Inn opened at the end of 2018 and the Marriott Envue is expected to open in the third quarter 2019.   The construction of the project is estimated to cost $159.9 million, with construction costs of $153.6 million incurred by the venture through March 31, 2019.  The project costs are expected to be funded from a $94 million construction loan (with $76.7 million outstanding as of March 31, 2019).



The Company is developing a 313-unit multi-family project known as Building 8/9 at Port Imperial in Weehawken, New Jersey, which began construction in third quarter 2018.  The construction project, which is estimated to cost $142.9 million, of which construction costs of $44 million have been incurred through March 31, 2019, is expected to be ready for occupancy in fourth quarter 2020.  The Company is expected to fund $50.9 million of construction costs, of which the Company has incurred $44 million as of March 31, 2019, and the remaining construction costs are expected to be funded primarily from a $92 million construction loan.



The Company is developing a 326-unit multi-family project known as Chase III at Overlook Ridge in Malden, Massachusetts, which began construction in third quarter 2018.  The construction project, which is estimated to cost $99.9 million, of which $21.2 million have been incurred through March 31, 2019, is expected to be ready for occupancy in third quarter 2020.  The Company is expected to fund $37.9 million of construction costs, of which the Company has incurred $21.2 million as of March 31, 2019, and the remaining construction costs are expected to be funded primarily from a $62 million construction loan.



The Company is developing a 198-unit multi-family project at 233 Canoe Brook – Apartments located in Short Hills, New Jersey, which began construction in fourth quarter 2018.  The construction project, which is estimated to cost $99.6 million, of which $22.2 million have been incurred through March 31, 2019, is expected to be ready for occupancy in fourth quarter 2020.  The Company is expected to fund $35.6 million of the construction costs, of which the Company has incurred $22.2 million as of March 31, 2019, and the remaining construction costs are expected to be funded primarily from $64 million in future financing.



The Company is developing a 750-unit multi-family project at 25 Christopher Columbus in Jersey City, New Jersey, which began construction in first quarter 2019.  The construction project, which is estimated to cost $470.6 million, of which $63.3 million have been incurred through March 31, 2019, is expected to be ready for occupancy in first quarter 2022.  The Company is expected to fund $170.6 million of the construction costs, of which the Company has funded $63.3 million as of March 31, 2019, and the remaining construction costs are expected to be funded primarily from $300 million in future financing.



EXECUTIVE EMPLOYMENT AGREEMENTS

On March 13, 2019, the General Partner entered into a new executive employment agreement, dated as of March 13, 2019 (the “DeMarco Employment Agreement”), with Michael J. DeMarco, the Company’s Chief Executive Officer, effective as of January 1, 2019.  The DeMarco Employment Agreement replaces Mr. DeMarco’s previous employment agreement with the Company, the term of which expired on December 31, 2018, and is effective as of January 1, 2019.  The Employment Agreement has been approved by the Board of Directors of the General Partner.  Pursuant to the DeMarco Employment Agreement, Mr. DeMarco will serve as the Chief Executive Officer of the Company, until December 31, 2022 (the “Term”), unless Mr. DeMarco’s employment is earlier terminated in accordance with the DeMarco Employment Agreement.  Pursuant to the DeMarco Employment Agreement, Mr. DeMarco will be entitled to the following compensation and benefits:



·

an annual base salary of $800,000 (which is the same amount as Mr. DeMarco’s base salary for 2018), subject to potential annual merit increases (but not decreases);

·

a threshold bonus opportunity of 75% of Mr. DeMarco’s then current annual base salary, a target annual bonus opportunity of 150% of his then current annual base salary, and a maximum bonus opportunity of 250% of his then current annual base salary, to be determined based on attainment of performance criteria for each fiscal year to be determined by the Board of Directors or the Compensation Committee; and

·

the grant of 625,000 AO LTIP Units of limited partnership interests in the Operating Partnership (the “AO LTIP Units”),which have the terms and conditions set forth in the AO LTIP award agreement and shall vest based on satisfaction of certain conditions relating to the closing price of shares of the Common Stock.  See Note 15: Mack-Cali Realty Corporation Stockholders’ Equity and Mack-Cali Realty LP’s Partners’ CapitalAO LTIP Units.



In addition, Mr. DeMarco will be entitled to customary employee benefits under the Company’s health and welfare plans.  Pursuant to the DeMarco Employment Agreement, in the event of a termination of Mr. DeMarco’s employment on account of death or disability, Mr. DeMarco (or his beneficiaries, in the case of death) will be entitled to receive his accrued and unpaid base salary, expense reimbursement and benefits under the Company’s health and welfare plans through the termination date, plus a prorated portion of the annual bonus payable for the year of such termination.



In the event of a termination of Mr. DeMarco’s employment without “Cause” or by Mr. DeMarco for “Good Reason during the Term or thereafter during a “Change in Control Period” (each as defined in the DeMarco Employment Agreement), subject to Mr. DeMarco signing a release in customary form, he will be entitled to the same benefits in the event of a termination due to death or disability, plus a lump sum cash payment equal to (i) if such termination occurs during the Term and not during a Change in Control Period, 2.0 times the sum of (x) his annual base salary immediately prior to the termination date and (y) his target bonus for the year during which termination occurs, or (ii) if such termination occurs during or after the expiration the Term and during a Change in Control Period, 3.0 times the sum of (x) his annual base salary immediately prior to the termination date and (y) his target bonus for the year during which termination occurs.  In addition, Mr. DeMarco will be entitled to COBRA coverage premiums for up to 18 months after such termination. Pursuant to the DeMarco Employment Agreement, Mr. DeMarco will be subject to certain restrictive covenants, including noncompetition and non-solicitation covenants during the period of his employment with the Company and for 12 months after termination of his employment in circumstances in which he is entitled to receive severance benefits under the DeMarco Employment Agreement.   The DeMarco Employment Agreement includes customary provisions relating to confidentiality, return of Company documents and property upon termination of employment, and certain other matters.



On March 13, 2019, the Board of Directors of the General Partner promoted Giovanni M. DeBari, the Company’s senior vice president and corporate controller, to Chief Accounting Officer, and on March 22, 2019, the Company entered into an employment agreement (the “DeBari Employment Agreement”) with Mr. DeBari.  Pursuant to the DeBari Employment Agreement, Mr. DeBari will serve as the Chief Accounting Officer of the Company through December 31, 2021 (the “Term”) unless Mr. DeBari’s employment is earlier terminated in accordance with the DeBari Employment Agreement.



Pursuant to the DeBari Employment Agreement, Mr. DeBari will be entitled to the following compensation and benefits:



·

an annual base salary of $450,000, subject to potential annual merit increases (but not decreases); and

·

an annual cash bonus opportunity to be based on performance goals to be established annually by the Compensation Committee.



Mr. DeBari will also be eligible to be granted long-term incentive or equity awards, as may be determined by the Compensation Committee in its sole discretion, under such plans and programs as may be in effect from time to time.  In addition, Mr. DeBari will be entitled to customary employee benefits under the Company’s health and welfare plans.



Pursuant to the DeBari Employment Agreement, in the event of a termination of Mr. DeBari’s employment on account of death or disability, Mr. DeBari (or his beneficiaries, in the case of death) will be entitled to receive his accrued and unpaid base salary, expense reimbursement and benefits under the Company’s health and welfare plans through the termination date, plus a prorated portion of the annual bonus payable for the year of such termination.



In the event of a termination of Mr. DeBari’s employment without “Cause” or by Mr. DeBari for “Good Reason” during the Term or thereafter during a “Change in Control Period” (each as defined in the DeBari Employment Agreement), subject to Mr. DeBari signing a release in customary form, he will be entitled to the same benefits as in the event of a termination due to death or disability, plus a lump sum cash payment equal to 1.5 times the sum of (a) his annual base salary immediately prior to the termination date and (b) his target bonus for the year during which termination occurs. In addition, Mr. DeBari will be entitled to COBRA coverage premiums for up to 18 months after such termination.



Pursuant to the DeBari Employment Agreement, Mr. DeBari will be subject to certain restrictive covenants, including non-competition and non-solicitation covenants during the period of his employment with the Company and for 12 months after termination of his employment in circumstances in which he is entitled to receive severance benefits under the DeBari Employment Agreement.  The DeBari Employment Agreement includes customary provisions relating to confidentiality, return of Company documents and property upon termination of employment, and certain other matters.



OTHER

On August 11, 2017, the Company acquired an existing mortgage note receivable encumbering a vacant developable land parcel located in Jersey City, New Jersey (the “Land Property”) with a balance of $44.7 million (the “Land Note Receivable”).  The Land Note Receivable matures in July 2019 and earns interest at an annual rate of 5.85 percent which accrues monthly and is payable at maturity.  In March 2018, the Company received a partial prepayment of $3 million.  The Land Property is currently an unimproved land parcel which operates as a surface parking facility.  Additionally, the Company has an agreement to acquire the Land Property for a purchase price of $67 million.



Through February 2016, the Company could not dispose of or distribute certain of its properties, which were originally contributed by certain unrelated common unitholders of the Operating Partnership, without the express written consent of such common unitholders, as applicable, except in a manner which did not result in recognition of any built-in-gain (which may result in an income tax liability) or which reimbursed the appropriate specific common unitholders for the tax consequences of the recognition of such built-in-gains (collectively, the “Property Lock-Ups”).  Upon the expiration in February 2016 of the Property Lock-Ups, the Company is generally required to use commercially reasonable efforts to prevent any sale, transfer or other disposition of the subject properties from resulting in the recognition of built-in gain to the specific common unitholders, which include members of the Mack Group (which includes William L. Mack, Chairman of the General Partner’s Board of Directors; David S. Mack, director; and Earle I. Mack, a former director), the Robert Martin Group (which includes Robert F. Weinberg, a former director and current member of the General Partner’s Advisory Board), and the Cali Group (which includes John R. Cali, a former director and current member of the General Partner’s Advisory Board).  As of March 31, 2019, after the effects of tax-free exchanges on certain of the originally contributed properties, either wholly or partially, over time, 26 of the Company’s properties, with an aggregate carrying value of approximately $1.2 billion, are subject to these conditions.   

Mack-Cali Realty LP [Member]  
Commitments And Contingencies [Line Items]  
Commitments And Contingencies

12.  COMMITMENTS AND CONTINGENCIES



TAX ABATEMENT AGREEMENTS

Pursuant to agreements with certain municipalities, the Company is required to make payments in lieu of property taxes (“PILOT”) on certain of its properties and has tax abatement agreements on other properties, as follows: 



The Harborside Plaza 4-A agreement with the City of Jersey City, as amended, which commenced in 2002, is for a term of 20 years.  The annual PILOT is equal to two percent of Total Project Costs, as defined.  Total Project Costs are $49.5 million.  The PILOT totaled $270,000 and $270,000 for the three months ended March 31, 2019 and 2018, respectively.



The Harborside Plaza 5 agreement, also with the City of Jersey City, as amended, which commenced in 2002, is for a term of 20 years.  The annual PILOT is equal to two percent of Total Project Costs, as defined.  Total Project Costs are $170.9 million.  The PILOT totaled $1.1 million and $1.1 million for the three months ended March 31, 2019 and 2018, respectively.



The Port Imperial South 1/3 Garage development project agreement with the City of Weehawken has a term of five years beginning when the project is substantially complete, which occurred in the fourth quarter of 2015.  The agreement provides that real estate taxes be paid at 100 percent on the land value of the project only over the five-year period and allows for a phase in of real estate taxes on the building improvement value at zero percent in year one and 95 percent in years two through five.



The Port Imperial Hotel development project agreement with the City of Weehawken is for a term of 15 years following substantial completion, which commenced initial operation in December 2018.  The annual PILOT is equal to two percent of Total Project Costs, as defined therein. 



The Port Imperial South 11 development project agreement with the City of Weehawken is for a term of 15 years following substantial completion, which occurred in August 2018.  The annual PILOT is equal to 10 percent of Gross Revenues, as defined therein.



The 111 River Realty agreement with the City of Hoboken, which commenced on October 1, 2001 expires in April 2022.  The PILOT payment equaled $1.2 million annually through April 2017 and then increased to $1.4 million annually until expiration.  The PILOT totaled $352,000 and $352,000 for the three months ended March 31, 2019 and 2018, respectively.



The Monaco Towers agreement with the City of Jersey City, which commenced in 2011, is for a term of 10 years.  The annual PILOT is equal to 10 percent of gross revenues, as defined.  The PILOT totaled $0.4 million and $0.6 million for the three months ended March 31, 2019 and 2018, respectively.



The Marbella II agreement with the City of Jersey City, which commenced in 2016, is for a term of 10 years.  The annual PILOT is equal to 10 percent of gross revenues for years 1-4, 12 percent of gross revenues for years 5-8 and 14 percent of gross revenue for years 9-10, as defined therein.  The PILOT totaled $0.2 million for the period from acquisition (January 31, 2019), through March 31, 2019.



The Port Imperial South Parcel 8/9 development project agreement with the City of Weehawken is for a term of 25 years following substantial completion, which is anticipated to occur in the fourth quarter 2020.  The annual PILOT is equal to 11 percent of gross revenue for years 1-10, 12.5 percent for years 11-18 and 14 percent for years 19-25, as defined therein.



At the conclusion of the above-referenced agreements, it is expected that the properties will be assessed by the municipality and be subject to real estate taxes at the then prevailing rates.



LITIGATION

The Company is a defendant in litigation arising in the normal course of its business activities.  Management does not believe that the ultimate resolution of these matters will have a materially adverse effect upon the Company’s financial condition taken as whole.



GROUND LEASE AGREEMENTS

Future minimum rental payments under the terms of all non-cancelable ground leases under which the Company is the lessee, as of March 31, 2019, are as follows (dollars in thousands):



 

 



 

 

Year

 

Amount

April 1 through December 31, 2019

$

1,297 

2020

 

1,750 

2021

 

1,750 

2022

 

1,750 

2023

 

1,750 

2024 through 2084

 

158,007 



 

 

Total

$

166,304 

 

Ground lease expense incurred by the Company amounted to $629,651 and $550,000 during the three months ended March 31, 2019 and 2018, respectively.



In conjunction with the adoption of ASU 2016-02 (Topic 842), starting on January 1, 2019, the Company capitalized operating leases, which had a balance of $22.5 million at March 31, 2019 for five ground leases.  Such amount represents the net present value (“NPV”) of future payments detailed above.  The incremental borrowing rates used to arrive at the NPV ranged from 5.637 percent to 7.618 percent for the remaining ground lease terms ranging from 6.25 years to 82.58 years.  These rates were arrived at by adjusting the fixed rates of the Company’s mortgage debt with debt having terms approximating the remaining lease term of the Company’s ground leases and calculating notional rates for fully-collateralized loans.



CONSTRUCTION PROJECTS

In 2015, the Company entered into a  90-percent owned joint venture with XS Port Imperial Hotel, LLC to form XS Hotel Urban Renewal Associates LLC, which is developing a 372-key hotel (164 keys Residence Inn and 208 keys Marriott Envue) in Weehawken, New Jersey.  The Company acquired the remaining 10 percent interest in the joint venture on March 26, 2019.  The Residence Inn opened at the end of 2018 and the Marriott Envue is expected to open in the third quarter 2019.   The construction of the project is estimated to cost $159.9 million, with construction costs of $153.6 million incurred by the venture through March 31, 2019.  The project costs are expected to be funded from a $94 million construction loan (with $76.7 million outstanding as of March 31, 2019).



The Company is developing a 313-unit multi-family project known as Building 8/9 at Port Imperial in Weehawken, New Jersey, which began construction in third quarter 2018.  The construction project, which is estimated to cost $142.9 million, of which construction costs of $44 million have been incurred through March 31, 2019, is expected to be ready for occupancy in fourth quarter 2020.  The Company is expected to fund $50.9 million of construction costs, of which the Company has incurred $44 million as of March 31, 2019, and the remaining construction costs are expected to be funded primarily from a $92 million construction loan.



The Company is developing a 326-unit multi-family project known as Chase III at Overlook Ridge in Malden, Massachusetts, which began construction in third quarter 2018.  The construction project, which is estimated to cost $99.9 million, of which $21.2 million have been incurred through March 31, 2019, is expected to be ready for occupancy in third quarter 2020.  The Company is expected to fund $37.9 million of construction costs, of which the Company has incurred $21.2 million as of March 31, 2019, and the remaining construction costs are expected to be funded primarily from a $62 million construction loan.



The Company is developing a 198-unit multi-family project at 233 Canoe Brook – Apartments located in Short Hills, New Jersey, which began construction in fourth quarter 2018.  The construction project, which is estimated to cost $99.6 million, of which $22.2 million have been incurred through March 31, 2019, is expected to be ready for occupancy in fourth quarter 2020.  The Company is expected to fund $35.6 million of the construction costs, of which the Company has incurred $22.2 million as of March 31, 2019, and the remaining construction costs are expected to be funded primarily from $64 million in future financing.



The Company is developing a 750-unit multi-family project at 25 Christopher Columbus in Jersey City, New Jersey, which began construction in first quarter 2019.  The construction project, which is estimated to cost $470.6 million, of which $63.3 million have been incurred through March 31, 2019, is expected to be ready for occupancy in first quarter 2022.  The Company is expected to fund $170.6 million of the construction costs, of which the Company has funded $63.3 million as of March 31, 2019, and the remaining construction costs are expected to be funded primarily from $300 million in future financing.



EXECUTIVE EMPLOYMENT AGREEMENTS

On March 13, 2019, the General Partner entered into a new executive employment agreement, dated as of March 13, 2019 (the “DeMarco Employment Agreement”), with Michael J. DeMarco, the Company’s Chief Executive Officer, effective as of January 1, 2019.  The DeMarco Employment Agreement replaces Mr. DeMarco’s previous employment agreement with the Company, the term of which expired on December 31, 2018, and is effective as of January 1, 2019.  The Employment Agreement has been approved by the Board of Directors of the General Partner.  Pursuant to the DeMarco Employment Agreement, Mr. DeMarco will serve as the Chief Executive Officer of the Company, until December 31, 2022 (the “Term”), unless Mr. DeMarco’s employment is earlier terminated in accordance with the DeMarco Employment Agreement.  Pursuant to the DeMarco Employment Agreement, Mr. DeMarco will be entitled to the following compensation and benefits:



·

an annual base salary of $800,000 (which is the same amount as Mr. DeMarco’s base salary for 2018), subject to potential annual merit increases (but not decreases);

·

a threshold bonus opportunity of 75% of Mr. DeMarco’s then current annual base salary, a target annual bonus opportunity of 150% of his then current annual base salary, and a maximum bonus opportunity of 250% of his then current annual base salary, to be determined based on attainment of performance criteria for each fiscal year to be determined by the Board of Directors or the Compensation Committee; and

·

the grant of 625,000 AO LTIP Units of limited partnership interests in the Operating Partnership (the “AO LTIP Units”),which have the terms and conditions set forth in the AO LTIP award agreement and shall vest based on satisfaction of certain conditions relating to the closing price of shares of the Common Stock.  See Note 15: Mack-Cali Realty Corporation Stockholders’ Equity and Mack-Cali Realty LP’s Partners’ CapitalAO LTIP Units.



In addition, Mr. DeMarco will be entitled to customary employee benefits under the Company’s health and welfare plans.  Pursuant to the DeMarco Employment Agreement, in the event of a termination of Mr. DeMarco’s employment on account of death or disability, Mr. DeMarco (or his beneficiaries, in the case of death) will be entitled to receive his accrued and unpaid base salary, expense reimbursement and benefits under the Company’s health and welfare plans through the termination date, plus a prorated portion of the annual bonus payable for the year of such termination.



In the event of a termination of Mr. DeMarco’s employment without “Cause” or by Mr. DeMarco for “Good Reason during the Term or thereafter during a “Change in Control Period” (each as defined in the DeMarco Employment Agreement), subject to Mr. DeMarco signing a release in customary form, he will be entitled to the same benefits in the event of a termination due to death or disability, plus a lump sum cash payment equal to (i) if such termination occurs during the Term and not during a Change in Control Period, 2.0 times the sum of (x) his annual base salary immediately prior to the termination date and (y) his target bonus for the year during which termination occurs, or (ii) if such termination occurs during or after the expiration the Term and during a Change in Control Period, 3.0 times the sum of (x) his annual base salary immediately prior to the termination date and (y) his target bonus for the year during which termination occurs.  In addition, Mr. DeMarco will be entitled to COBRA coverage premiums for up to 18 months after such termination. Pursuant to the DeMarco Employment Agreement, Mr. DeMarco will be subject to certain restrictive covenants, including noncompetition and non-solicitation covenants during the period of his employment with the Company and for 12 months after termination of his employment in circumstances in which he is entitled to receive severance benefits under the DeMarco Employment Agreement.   The DeMarco Employment Agreement includes customary provisions relating to confidentiality, return of Company documents and property upon termination of employment, and certain other matters.



On March 13, 2019, the Board of Directors of the General Partner promoted Giovanni M. DeBari, the Company’s senior vice president and corporate controller, to Chief Accounting Officer, and on March 22, 2019, the Company entered into an employment agreement (the “DeBari Employment Agreement”) with Mr. DeBari.  Pursuant to the DeBari Employment Agreement, Mr. DeBari will serve as the Chief Accounting Officer of the Company through December 31, 2021 (the “Term”) unless Mr. DeBari’s employment is earlier terminated in accordance with the DeBari Employment Agreement.



Pursuant to the DeBari Employment Agreement, Mr. DeBari will be entitled to the following compensation and benefits:



·

an annual base salary of $450,000, subject to potential annual merit increases (but not decreases); and

·

an annual cash bonus opportunity to be based on performance goals to be established annually by the Compensation Committee.



Mr. DeBari will also be eligible to be granted long-term incentive or equity awards, as may be determined by the Compensation Committee in its sole discretion, under such plans and programs as may be in effect from time to time.  In addition, Mr. DeBari will be entitled to customary employee benefits under the Company’s health and welfare plans.



Pursuant to the DeBari Employment Agreement, in the event of a termination of Mr. DeBari’s employment on account of death or disability, Mr. DeBari (or his beneficiaries, in the case of death) will be entitled to receive his accrued and unpaid base salary, expense reimbursement and benefits under the Company’s health and welfare plans through the termination date, plus a prorated portion of the annual bonus payable for the year of such termination.



In the event of a termination of Mr. DeBari’s employment without “Cause” or by Mr. DeBari for “Good Reason” during the Term or thereafter during a “Change in Control Period” (each as defined in the DeBari Employment Agreement), subject to Mr. DeBari signing a release in customary form, he will be entitled to the same benefits as in the event of a termination due to death or disability, plus a lump sum cash payment equal to 1.5 times the sum of (a) his annual base salary immediately prior to the termination date and (b) his target bonus for the year during which termination occurs. In addition, Mr. DeBari will be entitled to COBRA coverage premiums for up to 18 months after such termination.



Pursuant to the DeBari Employment Agreement, Mr. DeBari will be subject to certain restrictive covenants, including non-competition and non-solicitation covenants during the period of his employment with the Company and for 12 months after termination of his employment in circumstances in which he is entitled to receive severance benefits under the DeBari Employment Agreement.  The DeBari Employment Agreement includes customary provisions relating to confidentiality, return of Company documents and property upon termination of employment, and certain other matters.



OTHER

On August 11, 2017, the Company acquired an existing mortgage note receivable encumbering a vacant developable land parcel located in Jersey City, New Jersey (the “Land Property”) with a balance of $44.7 million (the “Land Note Receivable”).  The Land Note Receivable matures in July 2019 and earns interest at an annual rate of 5.85 percent which accrues monthly and is payable at maturity.  In March 2018, the Company received a partial prepayment of $3 million.  The Land Property is currently an unimproved land parcel which operates as a surface parking facility.  Additionally, the Company has an agreement to acquire the Land Property for a purchase price of $67 million.



Through February 2016, the Company could not dispose of or distribute certain of its properties, which were originally contributed by certain unrelated common unitholders of the Operating Partnership, without the express written consent of such common unitholders, as applicable, except in a manner which did not result in recognition of any built-in-gain (which may result in an income tax liability) or which reimbursed the appropriate specific common unitholders for the tax consequences of the recognition of such built-in-gains (collectively, the “Property Lock-Ups”).  Upon the expiration in February 2016 of the Property Lock-Ups, the Company is generally required to use commercially reasonable efforts to prevent any sale, transfer or other disposition of the subject properties from resulting in the recognition of built-in gain to the specific common unitholders, which include members of the Mack Group (which includes William L. Mack, Chairman of the General Partner’s Board of Directors; David S. Mack, director; and Earle I. Mack, a former director), the Robert Martin Group (which includes Robert F. Weinberg, a former director and current member of the General Partner’s Advisory Board), and the Cali Group (which includes John R. Cali, a former director and current member of the General Partner’s Advisory Board).  As of March 31, 2019, after the effects of tax-free exchanges on certain of the originally contributed properties, either wholly or partially, over time, 26 of the Company’s properties, with an aggregate carrying value of approximately $1.2 billion, are subject to these conditions.